Skip to content
Reformas ProfesionalsMaresme, S.L.

Kitchen renovations

The kitchen is where good work shows most, and where a badly resolved installation causes the most trouble. We renew water feeds, waste pipes and the electrical circuit before a single unit goes in, so the result lasts and nobody has to open the wall again.

What it includes

  • Strip-out of the existing kitchen
  • New water feeds and waste pipes
  • Electrical circuit sized for appliances
  • Tiling, flooring and suspended ceiling
  • Fitting of units and worktop

How we work

  1. 1

    Visit and survey

    We come and see the job, take measurements and listen to what you need. Free of charge.

  2. 2

    Itemised quote

    You get a detailed quote with materials and timescales, so you know exactly what you are paying for.

  3. 3

    The work

    We coordinate every trade and keep the site clean, keeping you posted as the work progresses.

  4. 4

    Handover and guarantee

    We walk through the finished work with you and put right anything that needs it before calling it done.

Frequently asked questions

Can a kitchen be renovated without changing the services?

Sometimes, but if the pipes or the electrical circuit are old it usually makes sense to renew them at the same time: once the tiling and units are fitted, any repair means opening things up again.

Can I open the kitchen onto the dining room?

It depends on whether the wall between them is load-bearing or just a partition. That has to be checked before anything is knocked down, and in some cases it needs reinforcement or sign-off from a technician.

Related projects

After: Full kitchen renovation
After

Full kitchen renovation

New light-wood cabinets, a new worktop, integrated appliances and LED lighting under the wall units.

Shall we talk? No obligation

Send us a few lines and a couple of photos on WhatsApp, or give us a call. We'll tell you what needs doing and what it would cost, no small print.

Free quote, no obligation

WhatsApp